Product Code Database
barcode-scavenger
   » » Barcode: 9781157918028
Tag Barcode '9781157918028'.
Tag
Mark as Favorite

Power Stations in Finland: Biofuel Power Stations in Finland, Coal-Fired Power Stations in Finland, Hydroelectric Power Stations in Finland
 (

ISBN 9781157918028
REGISTERED: 01/01/18
UPDATED: 04/20/21
Power Stations in Finland: Biofuel Power Stations in Finland, Coal-Fired Power Stations in Finland, Hydroelectric Power Stations in Finland
Purchase includes free access to book updates online and a free trial membership in the publisher's book club where you can select from more than a million books without charge. Chapters: Biofuel Power Stations in Finland, Coal-Fired Power Stations in Finland, Hydroelectric Power Stations in Finland, Nuclear Power Stations in Finland, Peat-Fired Power Stations in Finland, Olkiluoto Nuclear Power Plant, Rauhalahti Power Station, Alholmens Kraft Power Station, Loviisa Nuclear Power Plant,


Specifications
  • ISBN bar code 9781157918028 ξ1 registered April 08 2016
  • Product category is Power-Stations-in-Finland Books-LLC Book

Purchase includes free access to book updates online and a free trial membership in the publisher's book club where you can select from more than a million books without charge. Chapters: Biofuel Power Stations in Finland, Coal-Fired Power Stations in Finland, Hydroelectric Power Stations in Finland, Nuclear Power Stations in Finland, Peat-Fired Power Stations in Finland, Olkiluoto Nuclear Power Plant, Rauhalahti Power Station, Alholmens Kraft Power Station, Loviisa Nuclear Power Plant, Pamilo Hydroelectric Power Plant, Kemijoki, Hanasaari Power Plant. Excerpt: Olkiluoto Nuclear Power Plant - Wikipedia, the free encyclopedia The first license application for the thirdEuropean Pressurized Reactorwas made in December 2000 and the original commissioning date of the third reactor was set to May 2009. However, in May 2009 the plant was "at least three and a half years behind schedule and more than 50 percent over-budget". The commissioning deadline has been postponed several times and as of June 2010 operation is set to start in 2013. The project was started by Areva NP, a joint venture of AREVA and Siemens, but Siemens withdrew and sold its share to AREVA. Work began on the Olkiluoto EPR in 2005, but various problems with workmanship have created delays: First to come to light were irregularities in foundation concrete, which caused work to slow on site for months. Later it was found that subcontractors had provided heavy forgings that were not up to project standards and which had to be re-cast. An apparent problem constructing the reactor's unique double-containment structure has also caused delays. According to Professor Stephen Thomas, "Olkiluoto has become an example of all that can go wrong in economic terms with new reactors". Areva and the utility involved "are in bitter dispute over who will bear the cost overruns and there is a real risk now that the utility will default". The project has also been criticized by the. More:


References
    ^ Power Stations in Finland: Biofuel Power Stations in Finland, Coal-Fired Power Stations in Finland, Hydroelectric Power Stations in Finland (revised Apr 2021)

Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
2/10 Page Rank
8 Page Refs
4s Time
32 Sources