Product Code Database
barcode-scavenger
   » » Barcode: 9780071714341
Tag Barcode '9780071714341'.
Tag
Mark as Favorite

From Dbr To Simplified-dbr For Make-to-order (chapter 9 Of Theory Of Constraints Handbook)
 (

ISBN 9780071714341
REGISTERED: 05/04/20
UPDATED: 10/31/20
From Dbr To Simplified-dbr For Make-to-order (chapter 9 Of Theory Of Constraints Handbook)

This is an individual chapter of Theory of Constraints Handbook


Specifications
  • From Dbr To Simplified-dbr For Make-to-order (chapter 9 Of Theory Of Constraints Handbook) available on March 08 2016 from VitalSource for Https://www.vitalsource.com/search?term=9780071714341&cjsku=9780071714341" itemprop="offers" target="_external" title="" itemscope itemtype="http://schema.org/Offer">6.95
  • ISBN bar code 9780071714341 ξ1 registered March 08 2016
  • Product category is Book

  • # 9780071714341

Simplified-Drum-buffer-rope (S-DBR) is a variation on the well-known Drum-buffer-rope (DBR) production planning methodology. The chapter explains the change in thought that has guided the change, and then details the new features of the S-DBR method for make-to-order. The planning process is analyzed by three different perspectives. First, by the five focusing steps, a cornerstone in the TOC thinking. The second by recognizing the distinction between planning and execution that aim to handle the uncertainty in the best way. The last perspective is the four rules of flow, Dr. Goldratt’s reflections on the achievements of Henry Ford and Dr. Ohno. The chapter explains the main ingredients of the planning methodology: the use of just one buffer, the load control on the weakest link (planned-load), and how they determine the safe-date for any new order. Then the role of buffer management to handle the one and only priority scheme in the shop is explained in detail. Additional issues include the use of capacity reservation to handle situations of committing to very fast response to certain customers. Also discussed is the idea of the “slack†” taking advantage of offering the standard lead-times rather than offering the earlier safe-date. The scope of S-DBR is carefully analyzed showing how most of the ‘complexities’ of certain shop floors can be resolved. Situations where certain changes to S-DBR are necessary are analyzed as well. The last part of the chapter deals with implementation issues.


References
    ^ From Dbr To Simplified-dbr For Make-to-order (chapter 9 Of Theory Of Constraints Handbook) VitalSource. (revised Mar 2016)

Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
2/10 Page Rank
6 Page Refs
4s Time
32 Sources